> ## Content Index
> Fetch the complete content index at: https://newsanek.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# Maharashtra clears final parts of Navi Mumbai Development Plan, retains Advali-Bhutvali green belt
- URL: https://newsanek.com/navi-mumbai-final-development-plan-approved-maharashtra/
- Published: 2026-11-28T04:34:13.000Z
- Updated: 2026-11-28T04:50:25.000Z
- Description: The state's November 23 order covers seven areas, including Vashi, Airoli and Belapur. It keeps the Advali-Bhutvali green belt and drops proposed cycle tracks, while some proposals remain pending.
- Author: Kumar Ujjwal
- Tags: India, Maharashtra, Explainer, #state-maharashtra, #state-desk, #region-west, #sm-42, #smemo-useful

The Maharashtra government has cleared the remaining excluded parts of Navi Mumbai's Development Plan (DP).

A development plan is the master plan that decides how land in a city can be used.

The state issued the order on November 23.

It covers seven areas, called nodes: Airoli, Ghansoli, Koparkhairane, Vashi, Sanpada, Nerul and Belapur.

With this order, the state's approval process for the plan is now complete.

### Key points

- The state cleared the remaining excluded parts of Navi Mumbai's DP on November 23.
- The Advali-Bhutvali green belt stays protected, and proposed cycle tracks have been dropped.
- Some proposals have been rejected, some are on hold, and some are still pending.
- The main plan was sanctioned in July 2025.

## So what exactly did the government approve?

Many changes were made to land use, reservations, roads and civic facilities.

A reservation means land kept aside for a public purpose, such as a school, hospital or market.

In Airoli, reservations were approved for a fire station, market, library, parking, cultural centre, medical college and hospital.

A plan to change industrial land into residential land was rejected.

In Ghansoli, reservations for housing, markets, parking, ward offices and recreation were rearranged.

A proposal for the G-91 multipurpose ground has been kept in abeyance, which means it is on hold.

## Why is the Advali-Bhutvali green belt so important?

The government kept the Advali-Bhutvali Regional Park Zone (RPZ) almost unchanged.

An RPZ is an area set aside as a green park zone. Nearly 300 acres of green belt along the Mahape-Shil road remain protected.

The government had earlier rejected a civic body proposal to remove this reservation.

The only change is around 5 hectares across the Advali, Bhutvali and Borivali revenue villages.

The wider belt has about 1,100 acres of forest land. This is a separate figure from the 300 acres along the road.

Navi Mumbai DP cleared; Advali-Bhutvali belt kept

**300 acres**Green belt protected along Mahape-Shil road

**1,100 acres**Forest land in the wider belt

**5 hectares**Only area changed in the zone

**7 nodes**Areas covered by the order

Graphic: News Anek, from the facts in this report

Shiv Sena Navi Mumbai chief and corporator Kishor Patkar welcomed the protection of these hills.

He said the forest land should not be converted into residential areas.

## What happens next for the pending proposals?

The Belapur EP-B28 portion was cleared separately in November 2025.

The latest decision followed a review by the Joint Director of Town Planning, Konkan Division.

Some matters are still pending.

These include parts of Vashi, where proposals for slum rehabilitation, waste management and a sewage treatment plant are waiting for a decision.

The sources do not give a date for these decisions.

Explainer

### What happened before

- In July 2025, the state sanctioned the main part of Navi Mumbai's Development Plan.
- That same month, the government rejected a civic body proposal to remove the green belt reservation near Advali and Bhutvali.
- In November 2025, the state cleared the Belapur EP-B28 portion separately.

### Why it matters

The plan decides where homes, markets, parks and roads can be built in a large city. Green belts protect hills and forest land from being converted into housing.

### What to watch next

- Some proposals are still pending, and others are on hold in abeyance.
- The sources do not give a date for when the pending matters will be decided.

---

### Sources

- [Hindustan Times: Maharashtra govt clears Navi Mumbai’s final DP](https://www.hindustantimes.com/cities/mumbai-news/maharashtra-govt-clears-navi-mumbai-s-final-dp-101795806607577.html?ref=newsanek.com)